Date Reported | Incident Site | JIV Date | Terrain | Cause | Estimated Spill Volume (bbl) | Recovered Spill Volume (bbl) | Clean-up Status | Comments | Photo | JIV Report |
---|---|---|---|---|---|---|---|---|---|---|
2015-02-05 | Santa Barbara Well 12T Wellhead at Nembe Bassambiri | 2015-02-12 | Swamp | Sabotage | 0.1 | 0.05 | Spill was contained on 04 Feb 2015, no recoverable oil found, assessment completed on 25 Feb 2015, clean-up and remediation not required, site certified on 05 Aug 2015 | - | Download | Download |
2015-02-10 | 28" Nkpoku - Bomu Pipeline at Kporghor / Gbam | 2015-02-11 | Water | Sabotage | 50 | 25 | Recovery completed on 19 Feb 2015, assessment completed on 21 Sep 2016, clean-up and remediation planned for February 2017 | - | Download | Download |